Eye-Catching Daily Wear!Modern Jackets,Sleek Tops,Modern Blazers,Sleek Dresses and Contemporary Skirts make you stand out in the crowd.
Eye-Catching Daily Wear!Modern Jackets,Sleek Tops,Modern Blazers,Sleek Dresses and Contemporary Skirts make you stand out in the crowd. Eye-Catching Daily Wear!Modern Jackets,Sleek Tops,Modern Blazers,Sleek Dresses and Contemporary Skirts make you stand out in the crowd.
Cart(0)
Home Modern Jackets Motorcycle Jackets
Product Details

Recon GORE-TEX ADV Pants

  • GORE-TEX 3-layer stretch main body construction increases mobility and is guaranteed to keep you dry
  • Super-Fabric® material utilizes a ceramic coating to increase abrasion resistance and durability in high wear and impact areas
  • Fully seam-sealed construction
  • Reflective accents for increased visibility
  • Double layer saddle
  • Two large thigh intake vents for increased ventilation
  • Two rear exhaust vents flow air through the pants
  • YKK® Aqua-Guard® zippers
  • Two hand pockets and two thigh cargo pockets for increased storage
  • Universal jacket-to-pant interface works between all Fox Adventure pants and jackets
  • Adjustable side waist cinches for a custom fit
  • Adjustable lower leg openings are designed to work with all types and sizes of riding boots
  • Cuff binding allows the cuff to be hemmed
  • Full grain leather provides increased durability and protection at the lower legs
  • Removable Level 2 CE certified D3O® LP2 knee protectors in adjustable armor pockets
  • CE certified to EN 17092-4:2020 "A" and EN 1621-1 for impact protection

Materials

  • Shell: 67% polyamide nylon, 23% polyester, 6% cow leather, 4% elastane
  • Back: 100% polyamide nylon

 

Fox Recon GORE-TEX ADVENTURE Pants

  • 28
  • 30
  • 32
  • 34
  • 36
  • 38
  • 40
  • 42
  • 44
  • Dark Khaki Brown
  • Black

$ 1249.95

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable

You May Also Like

Cart
Eye-Catching Daily Wear!Modern Jackets,Sleek Tops,Modern Blazers,Sleek Dresses and Contemporary Skirts make you stand out in the crowd.
Your cart is currently empty.